Do you know the construction process of ceramic particles?

In the construction process of ceramic particles, it is required that the road surface has sufficient strength, high stability, a certain degree of smoothness, and appropriate anti-skid ability. When driving, excessive dust should not be generated to reduce damage to the road surface and vehicle components, maintain good visibility, and reduce environmental pollution.

ceramic particles

Construction technology of ceramic particles
1. Primer Primer Aggregate Surface Coating (mainly used for motor vehicle lanes).
2. Scratching of primer (coating aggregate) (mainly used for bicycle lanes).
3. Base oil - topcoat (scraping) - carving construction technology (mainly used for bicycle lanes) colored road surface.
4. Arrive at the construction site and arrive at the ceramic particle construction site on time or in advance according to the construction requirements.
5. Based on factors such as road width and traffic flow, the construction scope should be fully utilized with facilities such as traffic signs, traffic cones, roadblocks, warning tapes, etc. Equipped with traffic managers, wearing shoulder patches, sirens, and red flags, paying attention to traffic and pedestrians.
3. Clean the road surface with a grinder, wire brush, and broom to remove dust, moisture, and oil stains. Then, use a cleaning machine to clean the ground. After the ground is dry, apply base oil to the construction floor.
4. Paste the tape and mix the paint. After cleaning the ground, snap the line according to the construction requirements and stick the tape according to the snap line standard; At the same time, add an appropriate proportion of curing agent to the ceramic particles and stir.
5. For the bottom coating, use a scraper (using a scraper or scraper) to evenly apply the mixed coating onto the road surface.
6. Apply the aggregate evenly before the primer dries.
After the primer is completely cured, a scraper (using a drum or rake) should be used to evenly apply the surface coating to the road surface.
8. Measures for repairing and removing retaining walls: After construction, the workload should be calculated based on the actual situation, and the road surface that does not meet the requirements should be repaired. Methods should be found to remove overflow and irregular coatings, and the thickness and size should be checked. Check whether the dimensions and layout of the construction road meet the requirements of the drawings, and lift the closure measures to open up traffic.

ceramic particles

Today, the editor introduced the content about ceramic particles here. If you have any other questions, please feel free to consult us at any time.
Editor: Lynn

Contact us
Address: Zhangdian District, Zibo, Shandong
WhatsApp:+8615653328535
Wechat: +8615965331535
E-mail:zs@sdsmachinery.com